UM Bansalan LIC Logo

Matching supply with demand : (Record no. 10203)

MARC details
000 -LEADER
fixed length control field 01708nam a22002537a 4500
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20231005141422.0
006 - FIXED-LENGTH DATA ELEMENTS--ADDITIONAL MATERIAL CHARACTERISTICS
fixed length control field a||||dr|||| 001 0
007 - PHYSICAL DESCRIPTION FIXED FIELD--GENERAL INFORMATION
fixed length control field ta
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 230823t2024 |||acdodr|||| 001 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 978-1-266-15664-9
040 ## - CATALOGING SOURCE
Transcribing agency UM Bansalan LIC
082 ## - DEWEY DECIMAL CLASSIFICATION NUMBER
Edition number Fifth edition
Classification number BCir. 658.5
Item number C113m
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Cachon, Gerard
9 (RLIN) 16610
245 ## - TITLE STATEMENT
Title Matching supply with demand :
Remainder of title An introduction to operations management /
Statement of responsibility, etc. by Gerard Cachon
250 ## - EDITION STATEMENT
Edition statement Fifth edition
260 ## - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. New York :
Name of publisher, distributor, etc. McGraw-Hill,
Date of publication, distribution, etc. c2024
300 ## - PHYSICAL DESCRIPTION
Extent xviii, 520 pages :
Other physical details colored illustration ;
Dimensions 26 cm
500 ## - GENERAL NOTE
General note Includes glossary, references and indices.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Contents: Introduction--The Process view of the organization--Understanding the supply process: evaluating process capacity--Estimating and reducing labor costs--Batching and other flow interruptions: Set-up times and the economic order quantity model--The link between operations and finance--Quality and statistical process control--Lean operations and the Toyota production system--Variability on process performance: Waiting time problems--The impact of variability on process performance: Throughput losses--Scheduling to prioritize demand--Project management--Forecasting--Betting on uncertain demand: The Newsvendor model--Assemble-to-order, make-to-order, and quick response with reactive capacity--Service levels and lead times in supply chains: the order-up-to inventory model--Risk-pooling strategies to reduce and hedge uncertainty--Revenue management with capacity controls--Supply chain coordination.
650 ## - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Production management.
700 ## - ADDED ENTRY--PERSONAL NAME
Personal name Terwiesch, Christian
9 (RLIN) 16611
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Koha item type Bansalan Circulation1
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Current library Date acquired Total Checkouts Full call number Barcode Date last seen Price effective from Koha item type
    Dewey Decimal Classification     UM Bansalan College LIC 08/23/2023   BCir. 658.5 C113m 2024 8721 08/23/2023 08/23/2023 Bansalan Circulation1