000 | 01007nam a22002297a 4500 | ||
---|---|---|---|
001 | 4104 | ||
003 | OSt | ||
005 | 20241024100206.0 | ||
008 | 161004b xxu||||| |||| 00| 0 eng d | ||
020 | _a0-13-078759-0 | ||
040 | _cUM Bansalan College LIC | ||
082 |
_2Second edition _aBCir. 658.5 _bEl74a 1994 |
||
100 |
_91949 _aElsayed, Elsayed A. |
||
245 |
_aAnalysis and control and production systems/ _cby Elsayaed A. Elsayed and Thomas O. Boucher |
||
250 | _aSecond edition | ||
260 |
_aNew Jersey: _bPrentice Hall, _cc1994 |
||
300 |
_axiv, 444p.: _bill. _c23cm. |
||
500 | _aIncludes references, appendix and index | ||
505 | _acontents--1. introduction--2. forecasting and time-series analysis--3. inventory systems--4. aggregate production planning--5. material requirements planning--6. project planning and scheduling--7. job sequencing and operation scheduling--8. new direction in batch and discrete-parts production systems. | ||
700 |
_91950 _aBoucher, Thomas O. |
||
942 |
_2ddc _cBC |
||
999 |
_c1346 _d1346 |