000 | nam a22 7a 4500 | ||
---|---|---|---|
999 |
_c5618 _d5618 |
||
001 | 0264 | ||
003 | OSt | ||
005 | 20180213105658.0 | ||
008 | 180213b xxu||||| m||| 00| 0 eng d | ||
040 | _cUM Bansalan College LIC | ||
082 |
_aBFS _bB23a |
||
100 |
_97016 _aBarbosa, Christel Mae A. |
||
245 |
_aA project feasibility study on Alkafresh Water Refilling Station in Barangay Kingking, Pantukan, Compostela Valley Province / _cby Christel Mae A. Barbosa, Rabel D. Cabrasan, Rodelyn E. Curayag, Diether D. Dilag, Jayson A. Langala and Edlyn E. Nocum. |
||
260 |
_a-Tagum City: _bUM Tagum College, _cc2015. |
||
300 |
_ai, 41p.: _bill.; _c28cm. |
||
700 |
_97017 _aCabrasan, Rabel D. |
||
700 |
_97018 _a Curayag, Rodelyn E. |
||
700 |
_97020 _aDilag, Diether D. |
||
700 |
_97021 _aLangala, Jayson A. |
||
700 |
_97022 _aNocum, Edlyn E. |
||
942 |
_2ddc _cBFS |